The Ritual of Constant Motion
I am shifting my weight from my left foot to my right for the 39th time since this meeting began. My lower back is screaming because we are ‘standing up,’ a physical act meant to imply brevity, yet here we are, 49 minutes into a status report that could have been an email with 9 bullet points. The air in the conference room is thin, smelling faintly of burnt coffee and the desperation of 19 people trying to sound busy. This is the ritual we call Agile, a word that has been hollowed out until it resembles nothing more than a container for collective anxiety. We use the vocabulary of speed to mask the reality of stagnation.
Sarah, the project manager, is pointing at a digital board that looks like a neon graveyard of unfulfilled promises. There are 109 tickets in the ‘In Progress’ column, a mathematical impossibility for a team of our size, yet nobody mentions the 19 unfinished tasks from the previous cycle. We just move them. We slide them from one week to the next like we’re playing a very expensive game of Tetris where the blocks never actually disappear. I find myself nodding along to a joke the lead developer just made about a Scrum Master and a chicken. I didn’t get it. I didn’t even hear the setup, but I laughed anyway because 99 percent of surviving this environment is pretending you understand the punchline of a joke you weren’t invited to hear.
The Bridge Inspector’s Warning
“
They just painted over it. It looked great from the highway. People drove over it at 79 miles per hour, thinking they were safe because the surface was shiny. But the rust was eating the heart out of it.
– Muhammad J.D. ($9 Breakfast Special)
Muhammad J.D. knows about structural integrity in a way we never will. He is a bridge inspector, a man who spends his days looking for the microscopic fractures that suggest a 19-ton truck might soon find itself in the river. We met last Tuesday at a diner where the breakfast special cost exactly $9. I was complaining about our ‘velocity’-a metric we use to track how many features we ship, or rather, how many features we pretend to ship. Muhammad J.D. adjusted his worn cap and told me about a bridge he’d seen where the primary support beam had a 19-foot crack.
That conversation has been stuck in my head for 9 days. Our software process is that shiny paint. We have the ‘daily stand-up’ to show we are communicative, the ‘sprint’ to show we are fast, and the ‘retrospective’ to show we are reflective. But under the paint, there is a 59 percent decrease in actual productivity because we spend more time talking about the work than doing the work. We’ve adopted the rituals of a culture that values autonomy, but we’ve implemented them within a hierarchy that demands control. It is a biological rejection. The corporate body sees Agile as a virus and is currently producing 109 different types of antibodies to kill it. These antibodies take the form of ‘status syncs’ and ‘alignment sessions.’
The process is the monument we build to the work we are too afraid to start.
The Compliance Dashboard
I remember a time when I thought the problem was the software. I thought if we just had better tools, or maybe if the sprint was 19 days instead of 14, everything would align. But tools are just mirrors. If you have a broken culture, your tools will simply show you 109 different angles of that breakage.
Process Compliance
Features Used
I once tried to explain this to an executive who was obsessed with our Jira dashboard. He wanted to see 99 percent ‘green’ on his screen. He didn’t care if the product actually worked; he cared that the process looked compliant. It was like Muhammad J.D. told me about the bridge inspectors who get paid based on how many inspections they finish, not how many cracks they find. If you find a crack, you have to write a 19-page report. If you don’t find a crack, you just check a box and go home. Guess how many cracks get reported?
The Slow Deformation of Trust
We have reached a point where the ‘process’ has become the product. We ship Jira updates and Slack messages more frequently than we ship code. We are so busy being ‘Agile’ that we have forgotten how to be effective. Effectiveness requires deep work, quiet concentration, and the trust that your manager isn’t going to ask for a status update every 49 minutes. Instead, we have created a high-visibility panopticon where every developer is constantly justifying their existence. It is exhausting. It leads to a type of burnout that isn’t caused by overwork, but by the futility of performative work. You can work 9 hours a day, but if 8 of those hours are spent in meetings discussing what you will do in the remaining 1 hour, your soul starts to rust.
We’ve traded the ‘waterfall’ of the past for a ‘whirlpool’ of the present.
Muhammad J.D. and I walked along the northern span of the old city bridge yesterday. He pointed out 29 rivets that were slightly loose. To a casual observer, the bridge was a feat of engineering. To him, it was a ticking clock. He told me that most bridges don’t collapse because of a single catastrophic event; they collapse because of ‘creep’-the slow, invisible deformation of material over 99 years. Our ‘Agile’ chaos is a form of cultural creep. We lose 19 minutes of focus here, 49 minutes of autonomy there, and eventually, the whole structure of trust just… gives way. We find ourselves in a world where the only way to get anything done is to hide from the process. We work late at night, at 9 PM or 10 PM, just to have a few hours of ‘un-Agile’ time.
In the midst of this performative theater, there is a desperate need for actual clarity. We need systems that prioritize output over ritual, and results over documentation. This is where tools like Aissist become relevant, not as another layer of process, but as a way to automate the noise so that humans can return to the work that actually requires a human brain. We need to stop using technology to monitor our people and start using it to free them. If we can automate the status reports and the scheduling, maybe we can finally sit down and actually solve the problems that have been sitting in the backlog for 109 days.
WE ARE DROWNING
In the vocabulary of movement while standing perfectly still.
The Lie
19-page “Definition of Done” preventing completion.
The Truth
39% of features are never used.
Resonance Over Compliance
I think about that 19-foot crack Muhammad J.D. found. He eventually got them to fix it, but only after he threatened to leak the photos to the local news. It took a radical act of honesty to force the system to stop painting over the rust. Our software teams need a similar moment of radical honesty. We need to be able to say, ‘This stand-up is a waste of time,’ or ‘This sprint goal is a lie.’ We need to acknowledge that 39 percent of our features are never used by anyone, and that our 19-page ‘Definition of Done’ is actually preventing us from ever being done.
“
The structure of trust just… gives way. We lose 19 minutes of focus here, 49 minutes of autonomy there, and eventually, the whole system fails.
– Structural Diagnosis
It’s a strange feeling, being part of a system that you know is malfunctioning. You feel like a ghost in the machine, watching the gears grind against each other. I looked at Sarah today during the 49th minute of the meeting. She looked as tired as I felt. She doesn’t want to be there either. She doesn’t want to ask us why we aren’t done yet. She’s just a 39-year-old woman trying to satisfy a director who is looking at a dashboard he doesn’t understand. We are all victims of the same illusion. We have created a monster made of Post-it notes and we have to feed it every day at 9 AM or it will eat us.
The Hammer and the Flashlight
I want to find that resonance again-to spend 99 percent of my energy on the bridge and 0 percent on the paint.
Muhammad J.D. doesn’t have a dashboard. He has a hammer and a flashlight. He taps the steel and listens to the sound. He knows the difference between a solid strike and a hollow one. I want to find that kind of resonance in my work again. I want to build things that are structurally sound, not just ‘process-compliant.’ I want to spend 99 percent of my energy on the bridge and 0 percent on the paint. But for now, the meeting is finally ending. We are ‘done’ for the day, which means we have 19 more emails to answer and a ‘Retrospective’ scheduled for tomorrow at 9:59 AM. I’ll probably laugh at another joke I don’t understand, and I’ll definitely pretend that the paint is holding everything together.